Ministry of Power, Government of India notified “Integrated Power Development Scheme" (IPDS) on 3rd December’14 with following components:
As part of standardization process for smooth implementation of IPDS, Technical Specifications of key materials were finalized. Standard Bidding Document (SBD) was finalized in consultation with stakeholders. SBD may be customized by Utilities as per specific needs of the States with prior approval of State Level DRC constituted for IPDS.Works shall be awarded through e-tendering mode only.All materials shall be manufactured in India.Standard ratings of equipment shall be used. As per Quality Control Order for Electrical Transformers-2015 the Standard / ISI marking on Distribution Transformers is mandatory and should be manufactured as per Energy Efficiency Level-2 of IS 1180 Part-1: (2014).All the Feeder, DT and boundary meters shall be DLMS As part of standardization process for smooth implementation of IPDS, Technical Specifications of key materials were finalized. Standard Bidding Document (SBD) was finalized in consultation with stakeholders. SBD may be customized by Utilities as per specific needs of the States with prior approval of State Level DRC constituted for IPDS.Works shall be awarded through e-tendering mode only.All materials shall be manufactured in India.Standard ratings of equipment shall be used. As per Quality Control Order for Electrical Transformers-2015 the Standard / ISI marking on Distribution Transformers is mandatory and should be manufactured as per Energy Efficiency Level-2 of IS 1180 Part-1: (2014).All the Feeder, DT and boundary meters shall be DLMS open protocol meters alongwith AMR facility.
Designed,Developed & Maintained Solely by IPDS, Power Finance Corporation Ltd.